pp542f526a.png
Vertical Menus by Vista-Buttons.com v5.0.0
pp260053d4.png
pp260053d4.png
Cole Easdon Consutants | Civil Engineering Design, Transport Planning & Water Management
ppc2e05fea.png
ppc2e05fea.png
pp30655c83.png
Cole Easdon Consutants | Civil Engineering Design, Transport Planning & Water Management
left_shadow_top.png
left_shadow_middle.png
right_shadow_top.png
right_shadow_middle.png
Aerial Photograph of Hook Street, Swindon.
Photograph of Dauntsey's School, West Lavington, Wiltshire.
Carbon Footprint
pp1acf8808.png
It is important to understand the effect of the entire lifecycle of a project.

Carbon Footprint Studies can take into account the carbon footprint of the whole project by calculating the amount of carbon dioxide produced at each stage:

▪ The carbon dioxide generated during
construction, including travel to and from
the site by construction workers and the
embodied carbon dioxide of materials used
for construction such as clay or PVC pipe
work.

▪ The carbon dioxide generated by the
building in its everyday use, as a result of
energy usage for lighting, hot water, heating
etc.

▪ The carbon dioxide generated during
decommissioning.
The Benefits

As well as benefiting the environment and consumers, Carbon Footprint Studies will benefit developers:

▪ The study will enable developers to compare
 the sustainability of different designs and
 materials for the whole project.

▪ Carbon Footprint Studies can be
 incorporated into project specific Waste
 Management Plans.

▪ Overall the study offers a standout badge of
 environmental stability both in the way a
 development has been constructed and its
 ongoing environmental impact.
How Can We Help

Our expertise includes the carrying out of Carbon Footprint Studies.

Our services include:

▪ An introductory meeting to explain all the
 issues involved in carrying out a Carbon
 Footprint Study, including a sample study.

▪ Identifying the re-use of materials in
 Brownfield developments to reduce its
 Carbon Footprint.

▪ A Carbon Footprint Study tailored to the
 client and project requirements.

Click here for case study examples.
pp1acf8808.png
ppc2e05fea.png
ppc2e05fea.png
pp30655c83.png
pp4a08ed7a.png
Top of Page | © 2010 Cole Easdon Consultants Ltd
left_shadow_bottom.png
right_shadow_bottom.png
left_shadow_middle.png
right_shadow_middle.png