pp542f526a.png
Vertical Menus by Vista-Buttons.com v5.0.0
pp260053d4.png
pp260053d4.png
Cole Easdon Consutants | Civil Engineering Design, Transport Planning & Water Management
ppc2e05fea.png
ppc2e05fea.png
pp30655c83.png
Cole Easdon Consutants | Civil Engineering Design, Transport Planning & Water Management
left_shadow_top.png
left_shadow_middle.png
right_shadow_top.png
right_shadow_middle.png
Highway Improvement Works
pp1acf8808.png
Planning approval is often accompanied by the requirement to provide improvement works to the local highway network.  These highway improvement works require a high level of expertise in their design, management and supervision.

Cole Easdon Consultants is able to provide the expertise and experience required to obtain the necessary technical approvals from the statutory authorities during the design stage.  

We will provide the safest and most cost effective highway solution, which will take into account existing site constraints and all existing utility apparatus located within the highway corridor.

We will manage and site supervise the construction stage, to ensure a successful delivery of the proposed improvement works.

Construction characteristics such as grade, surface texture, sight distance, radii of horizontal bends and vertical slopes, in relation to design speed and road junction design, are all important elements of highway improvement works.
The Benefits

Highway improvement works will:

▪ Assist in securing planning permission for a
 development and in discharging planning
 conditions.

▪ Minimise the impact of the proposed
 development upon the existing highway
 network.

▪ Provide a more efficient highway network,
 which will benefit the development’s
 occupiers and the existing users of the
 highway network.

▪ Result in a timely and professionally
 prepared agreement under Section 278
 which will avoid delays to the completion of
 the development.

▪ Ensure that proposals for new highway
 infrastructure comply with relevant design
 standards will avoid costly rework and
 delays.
How We Can Help

We will ensure that your highway improvement works will satisfy the requirements of all relevant statutory bodies (e.g., The Highway Authority) and will:

▪ Carry out utility impact assessments, and
 undertake negotiations with utility
 companies.

▪ Provide all necessary design information to
 the Highway Authority to obtain technical
 approval (Section 38, 278 highway
 agreements, etc.).

▪ Provide design drawing packages for
 tendering and construction.

▪ Undertake detailed horizontal & vertical
 alignment design using PDS computer
 software.

▪ Provide detailed works specifications.

▪ Provide advice and recommendations on
 defective highway construction.

▪ Undertake street lighting and signage
 design.

▪ Calculate cut and fill volumes using 3D
 software.

▪ Compile Contract & Tender Documentation.

▪ Provide construction cost estimates.

▪ Undertake contract administration and site
 supervision.

▪ Undertake the role of CDM Co-ordinator.
Photograph Of Somerford Road, Cirencester.
Examples of Our Work

Kembrey Park, Swindon: S278 detailed design and specification of a new roundabout and access road, relating to a mixed use development comprising DIY retail, Crèche, Hotel, Family Pub/Restaurant and Health & Fitness Centre. More...

Leeds Schools: Assessment of existing highway access and design for improved highway access and car parking provision for six schools all to be upgraded within the City of Leeds as part of a Private Finance Initiative.  Safe Routes to school also formed part of the brief.

St Joseph’s College, Swindon: S278 detailed design for a new signalised access junction and pedestrian/cycle crossing for a new school campus.

National Diving & Activity Centre, Tidenham: S278 detailed design for major/minor priority junction into new Diving and Activity Centre site, located on the A48 Trunk Road near Chepstow. More...

Hunt Lane, Oldham: S278 works, Site Supervision, Project Management, Contract Administration and CDM Co-ordinator. More...

Long Hanborough: S278 detailed design and Site Supervision for upgrading of existing 3 arm roundabout to create a 4 arm roundabout to provide access to a new Co-op store. More...
pp1acf8808.png
ppc2e05fea.png
ppc2e05fea.png
pp30655c83.png
pp4a08ed7a.png
Top of Page | © 2010 Cole Easdon Consultants Ltd
left_shadow_bottom.png
right_shadow_bottom.png
left_shadow_middle.png
right_shadow_middle.png