pp542f526a.png
Vertical Menus by Vista-Buttons.com v5.0.0
pp260053d4.png
pp260053d4.png
Cole Easdon Consutants | Civil Engineering Design, Transport Planning & Water Management
ppc2e05fea.png
ppc2e05fea.png
pp30655c83.png
Cole Easdon Consutants | Civil Engineering Design, Transport Planning & Water Management
left_shadow_top.png
left_shadow_middle.png
right_shadow_top.png
right_shadow_middle.png
Case Studies
pp1acf8808.png
Commercial
Bracknell Forest Council, Bracknell:
Bracknell Forest Council commissioned CEC to produce a number of Transport Assessments and School Travel Plans in order to obtain planning permission for the expansion of four primary and infant/junior schools and a proposed children’s centre within Bracknell.  More...
Cheltenham College, Cheltenham:
Cheltenham College has a long-term plan to provide additional facilities and rationalise their existing facilities (including car parking) as part of the future development of the college.  More...
Dauntsey's School, West Lavington:
Cole Easdon Consultants (CEC) helped Dauntsey’s School in its redevelopment of former agricultural land to provide it with new parking areas, a pupil drop off/collection point for up to eight school coaches, a sports area for three football/rugby pitches, and a full size athletics track.  More...
ppddd602fd.png
Education
ppc13dff88_1b.jpg
pp4ddb21ad.png
ppe8fdab50.png
Abbotswood, Romsey:  CEC provided civil engineering, transport planning and water management consultancy services for a new 800 dwelling residential development, including a local amenity centre with public house/restaurant, shops, community centre, doctor/dentist's surgeries, a nursing/care home and associated public open space.  More...
Former Gerber Foods Factory, Bridgwater:
CEC prepared a surface and foul water drainage strategy in support of an outline planning application for a proposed residential development comprising 300 dwellings, located on a former food factory site in Bridgwater, Somerset.  More...
Folly Park, Faringdon:
Cole Easdon Consultants (CEC) were initially appointed by the client to undertake technical studies to support the allocation of a former horticulture nursery site for the provision of 400 new residential dwellings by the Vale of White Horse District Council.  More...
Residential
right_shadow_middle.png
left_shadow_middle.png
left_shadow_bottom.png
right_shadow_bottom.png
Blackmore Business and Technology Park, Malvern: CEC provided the full engineering design for a new access road and car parking, with associated drainage, to service the first phase of a 275,000 ft² (25,548 m²) mixed use business development at Blackmore Business & Technology Park, Malvern, Worcestershire.
More...
pp4f758779.png
Jacobean Moorings, Solihull:
Civil Engineering Design services including a cut and fill balancing exercise for a proposed canal boat marina. More...
pp0db5b7ba.png
Kembrey Park, Swindon:
A former factory site at Kembrey Park, Swindon, was redeveloped to create a mixed use development (retail, leisure and business) within an urban environment. A new roundabout was formed on the existing highway, together with industrial standard access roads within the site.  More...
pp4ab69b7f.png
Lingley Mere Business Park, Warrington:
CEC have been working in partnership with the clients behind the development of Lingley Mere Business Park (LMBP), a 1,250,000ft² development, on a long term basis since 2002. The masterplan for the development includes commercial properties with B1, B2 & B8 uses and includes a 132 bedroom hotel and amenity building.  More...
ppb056dab2.png
Stirling Way Industrial Estate, Peterborough:
CEC undertook flood modelling to quantify predicted flood levels and the impact on flood risk within the locality arising from a proposed flood defence wall to be constructed around an existing warehouse site on an industrial estate adjacent to the Marholm Brook in Peterborough.  More...
pp78dbe24d.png
The Laurels, Bolton:
CEC were asked to prepare a Transport Statement and Flood Risk Assessment in support of a planning application for intensification of use of an existing access serving one dwelling to serve a residential development of a further six dwellings at The Laurels, Markland Hill, Bolton.  More...
pp5f8f6586.png
Wapping High Street, Tower Hamlets:
CEC were asked by the client to produce a transport statement to support their planning application for the redevelopment of an office building in Wapping to provide approximately 60 car-free residential units.  More...
pp79839793.png
Ambrosia Creamery, Lifton:
CEC were commissioned by Premier Foods UK to design a flood defence scheme, following a near miss flooding situation at their existing food factory site in Devon. The scheme protected the Ambrosia creamery site from overtopping of the River Lyd during a 1:100 year + 20% climate change flood. More...
pp30084214.png
Unipart, Cowley:
CEC were appointed to consider the safety aspects of the existing traffic management arrangements associated with Unipart's headquarters site/distribution centre in Cowley, Oxford.  More...
pp7521017d.png
ppc6de25e2.png
pp6da32af8.png
ppbcda5992.png
pp45e0bc7e_1b.jpg
ppe0954c6d.png
St Hilda’s Court, Gloucester:
CEC prepared surface water drainage & flood risk assessments to ensure compliance with the SUR1 (surface water discharge) and SUR2 (flood risk) elements of the Code for Sustainable Homes (CSH) for a residential development of 12 apartments on a former church hall site. More...
Hunt Lane, Oldham:
Installation of a traffic signal controlled junction located on the A663 Trunk road, a road that connects the M60 and A627(M). Carriageway widening on three approaches to the junction was also implemented, which required significant remedial works to existing utility routes. More...
Hopton Park Industrial Estate, Devizes: 100m new access road and associated drainage works, to serve an extension to an existing industrial estate in Devizes, Wiltshire.  Remedial works to 750 m of previously implemented industrial access road and footways to enable adoption by the Highway Authority. More...
pp054244e8.png
Rowlands Castle, Hampshire:
Hampshire County Council (HCC) along with a house developer were named defendants in a legal case relating to flooding of existing dwellings during a storm in January 2008. Flooding was allegedly caused by a highway culvert and stream diversion works.  More...
ppf26d3846.png
Public Sector
National Diving Centre, Tidenham:
When the existing access arrangements for the National Diving & Activity Centre was found to be unsafe, CEC were asked to design a new Major/Minor Priority Junction on the A48 Trunk Road.  More...
Olympic Equestrian Events, Greenwich:
As part of the London 2012 Olympics, LOCOG (the London Organising Committee of the Olympic Games and Paralympic Games) will install a temporary 23,000 seat arena and associated facilities to host the equestrian events at Greenwich Park, London.  More...
Molineux Stadium, Wolverhampton:
Premiership football club Wolverhampton Wanderers FC (WWFC) want to expand their stadium, Molineux Stadium, from approximately 29,000 to 37,000 and also improve their supporter facilities at the same time. More...
ppcd7efee7.png
ppfb887148.png
pp47b70f62_1b.jpg
Sports & Leisure
Retail
Willow Brook Centre, Bradley Stoke:
CEC were instructed to prepare a report containing road safety advice for the access road into an existing retail park in Bradley Stoke, North Bristol. They were subsequently asked to provide an initial cost estimate for the construction of the preferred option. More...
Co-op Foodstore, Cinderford:
The Midcounties Co-operative (Co-op) have a foodstore in Cinderford, Gloucestershire. When competitor Tesco submitted a development proposal for a superstore and petrol filling station on the site of an adjacent rugby club on Dockham Road, the Co-op appointed CEC)to help prepare a suitable objection to the proposal.  More...
Co-operative Foodstore, Long Hanborough:
CEC were asked to design a Section 278 access road and highway improvement works to serve a new Co-operative foodstore in Long Hanborough, Oxfordshire. More...
Top of Page | © 2010 Cole Easdon Consultants Ltd
ppc791f7bb.png
ppfbdff8b2.png
ppd80cf0f0.png
St. Joseph’s School, Swindon:
The formation of a new (Section 278) access road, junction and road bridge into a large residential development constructed on former school playing fields, on the eastern outskirts of Swindon, Wiltshire. More...